What to include in an REO work order before crews mobilize

A useful work order connects access, existing conditions, authorized work, field documentation, approvals, and closeout before anyone is sent to the property.

Updated September 12, 2026
Closeout
documentation
  • Scope sheet
  • Photo log
  • Work items
  • Materials
  • Final conditions
  • Keys / access
  • Notes
Photo log
ScopePhotosConditionsCloseout
Illustrative process / sample document

Working tool

Pre-dispatch work-order check

Use this six-point review before a property assignment leaves the office.

  1. 01

    Confirm the property identifier, authorized access, occupancy status, and field contact.

  2. 02

    Separate observations, requests for pricing, and authorized work.

  3. 03

    Give every task an area, action, measurable limit, and expected finish.

  4. 04

    State the before, progress, and completion photo requirements.

  5. 05

    Name the approval route for newly discovered conditions.

  6. 06

    Define the invoice and closeout package before mobilization.

A work order should do more than name a task. It should tell the field team which property they are entering, what they are authorized to address, what must be documented, and what the client needs in order to review the completed assignment.

When those details are scattered across emails, portal notes, photographs, and phone calls, the crew can arrive without the information needed to proceed. The better approach is to settle the known facts before dispatch and make a clear path for questions that can only be answered at the property.

Confirm the property and access instructions

Start with the information that allows the site visit to happen safely and without guesswork.

  • The property identifier and the approved address used for the assignment
  • The primary client or vendor contact for questions
  • Lockbox, key, gate, or appointment instructions
  • Known occupancy status: vacant, occupied, partially occupied, or unknown
  • Areas the crew may enter and areas that remain restricted
  • Utility status when it affects the requested work
  • Known hazards, animals, active occupants, or access conditions
  • The date or completion window stated by the client

Occupancy should never be inferred from an exterior photograph. If the status is unknown, the work order should say so and explain what the field team should do if someone is present.

Separate observations from authorized work

A condition report and an authorization are different things. A photograph may show damaged drywall, an open fence, debris, or a roof concern. That does not automatically authorize repair or removal.

Write each approved task as a separate scope line. A clear line usually identifies:

  1. The area: front exterior, kitchen, second-floor bedroom, rear fence, or another specific location.
  2. The condition: what is present before work begins.
  3. The requested action: secure, remove, clean, repair, replace, protect, or document.
  4. The quantity or limit: the measurable extent of the authorized work when it is known.
  5. The required finish: the condition expected at completion.
  6. The documentation: photographs, measurements, receipts, disposal records, or notes required for review.

This structure gives the estimator and field team the same reference point. It also helps the client see where a price depends on an allowance, an assumption, or a condition that has not yet been opened up.

Plan the field record before the first photograph

Good documentation follows the work in a sequence. Before photographs establish the condition. Progress photographs explain work that becomes concealed or shows how a problem was addressed. Completion photographs show the finished scope from enough distance and detail to review it.

The exact photo rules belong to the organization issuing the assignment. Before mobilization, confirm:

  • Whether a mobile application or portal is required
  • How the property, room, and work-order number should be labeled
  • Which views are required for each task
  • Whether measurements or scale references must be visible
  • Whether progress photographs are required
  • How duplicate, dark, blurred, or unrelated images will be handled
  • Whether invoices, receipts, and disposal documentation must be attached

A long camera roll is not automatically a useful field record. Each photograph should help answer a specific question about condition, work, or completion.

Give unknown conditions a clear approval path

Existing properties often reveal more work after access is gained or materials are removed. The work order should explain who can authorize a change and what information that person needs.

A practical field question includes the location, the newly observed condition, the effect on the approved scope, supporting photographs, and the requested decision. If additional work is outside the authorization, document it and wait for direction unless an immediate condition requires the escalation procedure provided by the client.

This protects the owner from an unexplained invoice and protects the contractor from completing work that was never approved.

Define completion before the crew leaves

Closeout requirements should be visible from the beginning. Depending on the assignment, the package may include:

  • Before, progress, and completion photographs tied to each scope line
  • A short completion note describing what was performed
  • Measurements or quantities that support the invoice
  • Receipts or disposal documentation requested by the client
  • A list of incomplete items and the reason each remains open
  • New conditions reported for separate review
  • Confirmation that keys, lockboxes, utilities, and access points were left as directed
  • The name of the person who completed the field review

The field team should review the package while it is still at the property. Missing views and unclear notes are harder to correct after the site has been closed and the crew has moved on.

A pre-dispatch review for the owner or asset team

Before releasing the work order, ask:

  • Can the crew identify the exact property and gain authorized access?
  • Is occupancy known, and are the instructions appropriate for that status?
  • Is each task an observation, a request for pricing, or approved work?
  • Are quantities, limits, and finish expectations clear enough to price?
  • Does the work order explain how to raise a new condition?
  • Are the documentation and closeout requirements available to the field team?
  • Is there one contact who can answer time-sensitive questions?

If several answers are still unknown, keep them visible. A short list of open decisions is more useful than a work order that appears complete but leaves the crew to make owner decisions in the field.

Houston application

In the Houston market, the assignment may also involve local access constraints, storm exposure, heat, vegetation, utilities, and municipal conditions. Those facts belong in the property record when they affect the authorized scope. KIBA does not substitute a generic checklist for the servicer, investor, insurer, or municipality instructions attached to the actual work order.

KIBA reviews REO and property-preservation assignments around the property, the authorized scope, access, documentation, and closeout. Review KIBA’s REO and property-preservation service or send the available work-order details.

Questions owners ask

Frequently asked questions.

Should an REO crew start work when occupancy is unknown?

No. The work order should state that occupancy is unknown and provide the client-directed escalation procedure before entry or work.

Are photographs enough to authorize a repair?

No. Photographs document a condition. The work order or later written direction must identify what work is authorized.

What belongs in the closeout package?

Follow the issuing client requirements. A useful package usually connects each scope line to completion notes, required photographs, quantities, receipts, and unresolved conditions.

Primary references

Sources used for this guide.

  1. Single Family Housing Policy Handbook 4000.1U.S. Department of Housing and Urban Development
  2. Property Preservation Matrix and Reference GuideFannie Mae

Bring us the property

Turn the available information into a focused first conversation.

Prepare an REO project brief